Case Studies

CASE STUDIES

Gradient

TELECOMMUNICATIONS CASE STUDIES

East London Line Extension - Tunnel Telephone Design

East London Line Extension - Tunnel Telephone Design image

Fourway provided the engineering consultancy to design the new traction discharge system (tunnel telephone) for the East London Line Extension Project. In collaboration with rolling stock, p-way and civil engineers we developed the system engineering requirements and CDS around LU standards and HMRI legislation.

Read more...


White City Tunnel Telephone

White City Tunnel Telephone image

For this project Fourway provided Metronet tunnel telephone engineering and delivery services. We were engaged for feasibility, design, construction, bring into use and handover. Ou expertise in legacy LU tunnel telephone systems was a key factor for the engagement.

Read more...


Piccadilly Line Extension - Signal Post Telephone System

Piccadilly Line Extension - Signal Post Telephone System image

On behalf of Tubelines, Fourway provided the tunnel telephone for the Piccadilly Line Extension to Heathrow Terminal 5. This included all stages of design from concept development through to final delivery and handover.

Read more...


Piccadilly Line Extension - Tunnel Telephone System

Piccadilly Line Extension - Tunnel Telephone System image

On behalf of Tubelines, Fourway provided the tunnel telephone for the Piccadilly Line Extension to Heathrow Terminal 5. This included all stages of design from concept development through to final delivery and handover.

Read more...


Piccadilly Line Extension - OPO CCTV

Piccadilly Line Extension - OPO CCTV	 image

On behalf of Tubelines, Fourway provided the OPO CCTV for the Piccadilly Line Extension to Heathrow Terminal 5. This included all stages of design from concept development through to final delivery and handover.

Read more...


Nottingham area customer information improvements

Nottingham area customer information improvements image

Fourway were commissioned by Central Trains to engineer the new solution. Initially, in consultation with Network Rail we determined a strategy to ensure the CIS system could track trains with greater accuracy than with TRUST data and consequently able to display more reliable information to staff and passengers.

Read more...


East London Line Tunnel Telephone System

East London Line Tunnel Telephone System image

During a 3 year closure of the East London Line Fourway replaced the line normal tunnel telephone system. The primary reasons for the replacement was the existing assets were life expired.

Read more...


East London Line Tunnel Telephone System

East London Line Tunnel Telephone System image

During a 3 year closure of the East London Line Fourway replaced the line normal tunnel telephone system. The primary reasons for the replacement was the existing assets were life expired.

Read more...


Page 2 of 2