

PRE-BUILD
We operate a 7500sq foot pre-build facility at Cheshunt in Hertfordshire. This allows us to fabricate, assemble and pre-wire in a low cost, safe environment.
We undertake integration of different systems allowing trialling and acceptance testing to take place prior to site delivery. We do as much simulation as possible before we affect operational systems on the railway thus reducing programme and safety risk. We mock-up control rooms and control desks for ergonomic assessment and user acceptance.
BUILDING SERVICES


We undertake building services projects either as design and build or installation only. We cover electrical distribution networks, lighting and lighting control systems...
TELECOMMUNICATIONS


We deliver turnkey communication packages across the country's underground and overground network including design, supply, installation and commissioning. At stations, this typically includes...
SUPPLY CHAIN


Our ability to deliver to clients is dependent on sourcing services, materials and equipment from a wide range of UK and global companies.
OVERVIEW


Through our construction division we contract with end-clients and large civil or M&E contractors to deliver packages of building services, telecommunications and other systems...
SITE CAPABILITY


We have built a trusted, multi-skilled site workforce over many years. Dedication and ownership of the task in hand along with a team spirit are fundamental requirements.
CASE STUDIES
Kings Cross Station Southern Square - MEP and SISS

Fourway delivered the MEP and SISS package for Kings Cross Southern Square project the final transformation of the Regeneration Programme. We worked closely with our client J. Murphy to integrate our construction works into the overall programme ensuring minimal disruption to the public.
Reading Station Area Redevelopment - Telecommunications

Fourway designed and delivered the telecommunication requirements for Reading Station Area Redevelopment through a series of contracts. Starting at GRIP 4 Fourway worked with Tata and Grimshaw to develop the scheme to conclusion under Costain Hochtief.
Kings Cross Station Regeneration Programme - Telecommunications

Fourway designed and delivered the Kings Cross Station Regeneration Programme's telecommunication requirements through a series of contracts. Fourway master minded the entire systems migration for the Programme, providing a 'guiding mind' to ensure all strands of this complex project were brought together.

For this project Fourway provided Metronet tunnel telephone engineering and delivery services. We were engaged for feasibility, design, construction, bring into use and handover. Ou expertise in legacy LU tunnel telephone systems was a key factor for the engagement.