

SYSTEMS INTERFACE MANAGEMENT
Progressing construction works in the operational environment requires comprehensive planning of cabled infrastructure. Lack of attention to this interface can result in delay, system outage, poor stakeholder relations and loss of reputation.
We deploy specialist engineers into construction client teams to address this risk. Case Studies >
Typically, they acquire a detailed picture of the existing infrastructure through record review, survey and consultation with asset owners. In tandem they assess the proposed construction (ie ground works, demolition, piling, building works etc) by reviewing the design, programme and methodology. From this process we can determine a project life cycle impact allowing us to challenge and champion beneficial changes. We can also minimise enabling works by planning it as a series of linked stages thus avoiding a piecemeal approach.
By bringing these strands together under one leader, often referred to as a 'guiding mind', we identify important critical paths and cost-reducing initiatives for the project.
We empower our clients by bringing forward critical decision making and supporting with cost/benefit analysis to help them create the best strategy. We often provide this service at project development or ECI stages to help make cost forecasts more accurate.
We manage scenarios where the infrastructure has multiple-stakeholders providing them with vision and continuity. We focus on relationship building by regular communication and representing their interests.
ELECTRICAL & MECHANICAL


Renewable technology, energy conservation and sustainability are at the forefront of modern railway design. Fully embracing these principles our team have expertise...
TELECOMMUNICATIONS


We are a telecommunications integrator. We develop user requirements into robust design solutions across the spectrum of system technologies.
SURVEYING


We undertake a wide range of surveying tasks such as asset condition, spatial, cable tracing, record correlation, buried services, utilities etc. We deploy staff with the right technical experience to identify...
BIM


BIM allows us to create and manipulate our installations in a virtual world, showing how they integrate with all other elements of the built environment so our clients and stakeholders can visualise exactly...
ELECTRIFICATION & PLANT


We cover 750V DC supplies; substations; impedance protection systems; earthing and bonding solutions for both AC & DC scenarios;
OVERVIEW


Our Consulting Engineering division provides professional services for telecommunications, building services and associated railway systems.
CONTROL ROOM DESIGN


We recognise the operation of a control room has critical implications which create higher demands on engineering than for other built space.
SCADA & SMS


We have designed, specified and delivered SCADA and station management systems for a wide range of different applications on surface and underground rail infrastructure.
PROJECT MANAGEMENT


We have a large team of industry professionals who we can deploy to help support and deliver rail infrastructure projects.
CASE STUDIES
Kings Cross Station Regeneration Programme - Telecommunications

Fourway designed and delivered the Kings Cross Station Regeneration Programme's telecommunication requirements through a series of contracts. Fourway master minded the entire systems migration for the Programme, providing a 'guiding mind' to ensure all strands of this complex project were brought together.
Vauxhall Station Congestion Relief Project RIBA C-E Communications engineering

Fourway supported multi-discipline designer Halcrow (CH2M Hill) to help deliver design to RIBA C-E for the Vauxhall Station Congestion Relief Project. Our brief was to deliver the Communications engineering as a seamlessly integrated element of our client's organisation.
Farringdon Station Redevelopment - Interim Station Facilities

Fourway worked as an integrated part of the delivery team within the Costain Laing O’Rourke joint venture. The scope of our role included managing design and delivery of £2M interim station facility. This work stream ran for approximately 2 years and was crucial to delivering the overall programme.
Farringdon Station Redevelopment - Enabling works strategy and delivery

Fourway worked as an integrated part of the delivery team within the Costain Laing O’Rourke joint venture. Over 4 years we provided enabling works strategy and delivery for the multiple phase construction sequence where the station had to be kept operational at all times.