

TELECOMMUNICATIONS CASE STUDIES
Nottingham area customer information improvements

Fourway were commissioned by Central Trains to engineer the new solution. Initially, in consultation with Network Rail we determined a strategy to ensure the CIS system could track trains with greater accuracy than with TRUST data and consequently able to display more reliable information to staff and passengers.
East London Line Tunnel Telephone System

During a 3 year closure of the East London Line Fourway replaced the line normal tunnel telephone system. The primary reasons for the replacement was the existing assets were life expired.
Page 3 of 3