ALL CASE STUDIES
Wessex Capacity Enhancement - Waterloo Station & Outlying Areas

Fourway partnered with Amey to develop a comprehensive picture of existing asset information to support the Capacity Enhancement Programme. Rather than the two organisations retaining their corporate identities to form a rigid, hierarchical relationship we created a single collaborative project organisation. Whilst the bid responsibilities
Crossrail West - GRIP 5

Fourway is providing GRIP 5 engineering for Crossrail West. Appointed by Taylor Woodrow for MEP, SISS and E&P our design team is co-located in a central office forming a collaboration with the construction team, NR engineers, the civil engineering consultant and architect.
Euston HS2 Redevelopment - Feasibility

Engaged by Network Rail, Fourway were commissioned to support the feasibility stage of HS2 integration at Euston. Our work considered the impact of various development schemes upon the Station SISS systems and line of route ops telecomms.
STAKE Programme - Telecommunications

Fourway are a STAKE contractor. This is a 5 year framework for the refurbishment of 70 underground stations. We provide both design and construction services direct to London Underground across a broad range of station assets and systems.
Solum Regeneration - Guildford station area redevelopment

Established in July 2008, Solum regeneration is a partnership between Network Rail and Kier Property formed to attract private investment into the rail network. To support the overall viability assessments Fourway were engaged by Network Rail to identify all cabled infrastructure in the targeted development areas.
Silwood Sidings - LV, Lighting and SISS

Fourway delivered LV supplies, depot lighting and SISS systems in partnership with T Clarke for this important project. The works increased the capability of the Silwood Sidings site in South East London as an operational railway facility for the stabling of ten 5-car train units.
Gravesend Station Remodelling - Telecommunications

Fourway delivered the telecommunication to the Gravesend Station Remodelling Project. Forming a key partner for the 15-day Christmas blockade we delivered critical modifications across a range of SISS and ops telecomms asset groups.
Pudding Mill Lane DLR Station - Telecommunications

Contracted to deliver the telecommunications for Crossrail's C350 contract, Fourway separated the project into two elements: Firstly the design and installation of new systems for the fit out of the new DLR station and secondly the design and migration of existing control systems from the old Pudding Mill Lane Station to the new.
Kings Cross Station Southern Square - MEP and SISS

Fourway delivered the MEP and SISS package for Kings Cross Southern Square project the final transformation of the Regeneration Programme. We worked closely with our client J. Murphy to integrate our construction works into the overall programme ensuring minimal disruption to the public.
Wessex Package 7 - Telecommunications

For Wessex Package 7 Fourway provided the telecomms engineering and delivery through a partnership with construction company C. Spencer over a two year period. The work involved providing a detailed design and scope of works to suit the 50-station programme.
Page 1 of 3